3.the anti- of the water mill stone noodles layer proper cement sand syrup basic press strength to attain at the back of the 1.2 Nmm2 to build.
4.The water mill stone noodles layer paving front, should strach in the
cement sand basic up by the noodles layer cent space or press the cent space of design request
Of the diagram safety establish to divide space Qian, the copper should in advance adjust to keep.
5.Is applied the dense syrup being together compared by Chinese foot plank, using cement while inseting to divide space to glue to cover up a prison in the both sides of Qian,
The height should compare a Qian low 3 mms, dividing space Qian should ascend even deal with contact unanimously tight, and as the standard that builds a noodles layer, steady
Good after, water to protect a 3~4 ds, build cement and stone grain of noodles layer again to mix to match to anticipate.
6.Cement and stone grain mix to match to anticipate to dispense a work to calculate exactitude.
7.Before building, brush in the grass-roots surface a time of and noodles layer the color is same, water ash compares to 0.4~0.5 cements
The syrup does to combine a layer, with brush with spread the water mill stone mix to match to anticipate, the water mill stone mixs to match the paving thickness anticipating to want Gao Chu Fen space Qian 1 mm~
2 mms, spread neat, roll to press with the roller airtight solid, need a surface syrup after, use again to put on son to put on even, in the middle of rolling and ranning over a distance,
If discovering that the surface pebble is partial to is little, can repair Sa pebble in the cement more place and clap even, the increment is beautiful, the next day starts protecting.
8.Should do a deep color first while adopting a few color patterns on same noodles layer after doing a shallow color, do a big color first,
Behind do to trim border, before treating a kind of color syrup solidify after, again do behind 1 kind.
.9.Open should try to whet first before whetting, doing not loosen a square by surface stone grain can open to whet.
10.The use millstone machine cent time of the water mill stone noodles layer
dubs out, the head time is used 60~90 number the thick diamond whet, the side whets a side
Fill with water, request to whet even whet even, make the space Qian dew outside for all cents, after whetting mud blunt clean, use together color cement syrup
Put on to fill up a noodles layer the small hole and sink mark presented by surface, protect to whet again behind appropriately, 2 times are used 90~120 numbers
The diamond whets, request that whetting surface is smooth, other together head time, three times of the diamonds used No.180~240 whets and whet into
The surface pebble grain rears, neat and smooth, have no trachoma thin bore, after flushing with water, paint sour aqua of grass 1 time, 4 times are used 240-C30 oil stone, grinding into the white syrup surface is smooth, flush to dry in the air with water clean.
5.4.10Cement building ground:Basic should clean off before starting
construction and well moist, in order to prevent rise to raise.Should note while starting construction
The cent of the idea accepts syrup for many times, the last time accepts syrup to press light should at beginning Ning after eventually the Ning headway go.The ground is after starting construction well in time carry on keeping
Protect.The key lies in accepting syrup to press light and protects and have an arrangement abundant experience ground old teacher construction, ensure that the ground doesn't rise ash,
Don't rise hull.
5.4.11The ground brick spreads to carve:The paving seeks even before the layer, its bottom layer is cement material, its surface should be rough and clean
And moist, can not have already accumulated water phenomenon;The
ground brick should first wet with water before spreading to carve.Its surface has no clear water square to build.
Ground brick should cent segment at the same time cent carve, press the standard to hang line, with put on cement syrup with spreads to
carve.Spreads to carve a method generally from the centerline beginning to
The both sides spreads to carve respectively, spreading to carve a work should complete before combining the cement sand of layer syrup
coagulation.It's even to request a ground of brick noodles layer while spreading to carve
Is whole, the circuit fluently keep, trim border exactitude.Have already
spread and carved of the noodles layer want to use the wood hammer knock burliness and keep four capes from appearing an empty drum phenomenon.
5.4.12Movable floor
1.In order to make the movable floor noodles layer and the noodles layer conjunction in building ground of aisle or room passing like, it passes noodles The elevation of layer should correspond according to metal support model number chosen of wanting and being lower than the elevation of the movable floor's noodles layer, otherwise at
The primer should establish to mark time or the structure request and way of doing of the slope etc. form.
2.the grass-roots surface should be neat, clean, dry, not rise ash.The gearing is ex- to clean up clean, and according to the demand, at
Radicle surface Tu Shua's 1~2 times of pure paints or dust palliative paint, disallowing after brushing has already shed skin a phenomenon.
3.according to room flat surface circumstances, such as size and
equipments...etc., should press the paving direction that the movable floor mold number chooses a tectonic plate.
4.First each parts of movable floor construction good, take base line as quasi-, sequence at square the mesh hand over some place emplacement to pay And horizontal beam fix the base of support and link support and frame.In the process of installing in want to usually copy to be even, turn to use
Luo pole, adjust each with the spirit level the height of the noodles wait Gao to the whole room, and make each support be subjected to dint as far as possible even.
5.After all pillars and the frame that horizontal beam constitutes become integral whole, the application level instrument copies even.Then wreath Inside the crevice of of the oxygen resin infusion support base and cement basic, make of the conjunction is firm, may also use to inflate stud bolt or Shoot to nail a conjunction.
5.5The doors and windows install
The doors and windows fill a Tang craft after installing all the
adoption.Installing the doors and windows frame should after the wall noodles beat bottom, the noodles layer puts on ash headway to go.
5.5.1The wood door installs
1 press to design peaceful noodles position of the elevation that the diagram paper requests and open a direction to shoulding code emplacement, use a line and line
The hammer makes level and mourns to keep correcting, then uses to pull with close by the fixture link firm and reliable.
2.Reserve wood brick in carving body, each side's fixedly ordering should be no smaller than three, even use wood Xie unanimously will temporary
Fixedly in empress inside the hole in the door, nail a frame prison with the nail on the wood brick, crush flat to nail a hat, nail a hat cave go into a 1 mm~2 mms, at mix
Use to inflate a stud bolt fixed construction on the Ning soil.
3.Request to make sure to open a direction and use a small hardware model number according to the design specification, fix to plane a , install small five Gold fixed in the door.
5.5.2The aluminum metal alloy doors and windows install